• Home
  • About Us
  • Our Services
  • Our Partners
  • Our Portfolio
  • News
  • عربى
Contact Us

Studying the closure of ventilation openings in Suk-Shagir Tunnel

Client:

Makkah Municipality

Engineering and Consultancy Services for The Study of Tunnels Development at The Holy City of Makkah and The Sacred Places

Client:

DFB Consultancy firm

Owner:

Makkah Municipality
 

Engineering and Consultancy Services for The Study of Tunnels Development at The Holy City of Makkah and The Sacred Places

Client:

DFB Consultancy firm

Owner:

Makkah Municipality
 

Designing and Supervising the Process of Supplying and Installing Electricity Generators For The Tunnels at The Holy City of Makkah and The Sacred Places

Client:

DFB Consultancy firm

Owner:

Makkah Municipality
 

Studying the Stability of the Rocky Area Surrounding the Sulaymaniyah Tunnels After the Blasting Works that Took Place and the Effect of These Actions on the Stability of the Sulaymaniyah Tunnels
Supervising the Rehabilitation Works of the Entrance Area of the Sulaymaniyah Tunnel

Client:

Cities Radiation Est.

Owner:

Makkah Municipality
 

Stability of Birka Tunnels
Studying and Modeling the Mutual Interaction of the Tunnel Intersections being Implemented with the 2ed Ring road Tunnels Sector and the Al-Birka Tunnels Section

Client:

Saudi Binladin Group (SBG)

Dilapidation Survey for the Buildings Surrounding launching Shaft 1&2 and Shabaika Power Station

Client:

Saudi Binladin Group (SBG)

Providing Consulting Engineering Services to Design and Supervise the Blasting Works Related to Lowering the Level of the Jabal ElKaaba Road

Client:

Saudi Binladin Group (SBG)

The Work of Enumerating and Making Crack Mapping of the Distribution of Concrete Cracks Inside the Tunnels of King AbdulAziz Road Tunnels, and Supervising the Work of Removing the Metal supporting Frames Inside the Tunnels

Client:

Saudi Binladin Group (SBG)

Al-Kial Sea Bridge Rehabilitation, Obhor, Jeddah

Client:

Amro Kial Est.

Studies and Supervision of the Project for the Rehabilitation and Development of Mahmas Elgin region in Holly Makkah

Client:

Makkah Municipality

Follow Us

News

Recent Posts

  • Cooperation agreement with the German company Müller + Heret August 26, 2023
  • Holding a workshop to discuss the study of improving and increasing the efficiency of the ventilation system in Suq Shaguir tunnel March 1, 2023
  • The Company Won the Tender for the Structural Study of Jabal Shaybah Bridge February 22, 2023

Join Us

Copyright © 2023 Koothi . All rights reserved By Netmasr.com